Build a site brief before you book
List site opening hours, critical electrical equipment and any shutdown windows. Provide consumer unit or distribution board schedules and previous reports if available. Identify the person who can authorise access and isolation.
Choose testing by what needs checking
An EICR assesses the fixed installation. PAT or other equipment checks cover selected appliances and equipment. For emergency lighting and fire alarm records, identify who manages them and agree the specific work required.
Plan city-centre access
Ask your facilities team about loading bays, parking restrictions, keys and goods-lift bookings. TfL has current Congestion Charge information. Confirm these costs and access responsibilities in the scope where relevant.
Coordinate works across multiple sites
List the postcode, asset details, priorities and site contacts for each location. Agree which records should be delivered and how operational faults will be reported between visits.
